The University of Arizona Re-Awards KE&G a 5-year JOC Contract

After successful completion of a 5-year University of Arizona JOC Contract for Civil / Utility Construction, KE&G was just re-awarded the University of Arizona JOC for another 5 years. KE&G paved several parking lots, as well as sealed and striped several garage areas: 2nd street garage entrance, Cherry Avenue garage entrance, Highland garage entrance, Park…

Read More

Kostka & Michigan Sewer Realignments

The Kostka & Michigan Sewer Realignments Project was awarded to KE&G by PCRWRD in February 2015. The project consists of replacing an 8-in waterline; installing, removing and replacing, and abandoning 13 manholes; installing 562 feet of new sewer main; abandoning 612 feet of existing sewer main and abandoning four existing house sewer connections and replacing…

Read More

22nd Street Sewer Augmentation

This project consists of the augmentation of approximately 1 mile of wastewater lines. The selected stretch to be augmented is along 22nd Street from Alvernon Way, downstream end, to Swan Rd, upstream end. The existing sewer line is 10 inches in diameter vitrified clay pipe (VCP) between Alvernon Way and Swan Rd. This project received…

Read More

South East Interceptor (SEI) Augmentation CMAR Project

Augmentation of existing Southeast Interceptor (SEI) by installation of 4 miles of 36-48 inch sewer through the jurisdiction of Tucson and South Tucson. Includes bypass pumping and relocation of several waterlines. For construction updates, traffic alerts and the latest news on this project, click here. PROJECT OVERVIEW Delivery Method: Construction Manager at Risk Location: Euclid…

Read More

City of Williams Water Meter Replacement

The Williams Water Meter Replacement project is in the final stage of meter installations. To date there has been nearly 1500 meters installed, which is more than what we expected to install. Our meter crews have discovered several meters during the installation process that the city did not know existed. Some of these meters have…

Read More

Hydrant Replacement Project

This contract involved the replacement of 29 hydrants throughout the City of Tombstone. We faced several challenges with this project, including working with various types of pipe and removing hydrants dated as far back as 1942. PROJECT OVERVIEW LOCATION: TOMBSTONE TYPE:  MORE PROJECTS

Read More

Southwest Gas Douglas Parking Lot Reconstruction

This project involved removing and replacing a 10,000-square-feet parking lot. Construction began in June with an accelerated schedule in order to be completed before the monsoon rains. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: PARKING LOT CONSTRUCTION MORE PROJECTS

Read More

7th Street Pedestrian Crossing

This City of Sierra Vista project consists of installing a signalized pedestrian crossing on 7th street to allow the safe crossing for pedestrians. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE:   MORE PROJECTS

Read More

Myer School Track

This project consisted of the removal and replacement of a running track. Construction included milling, curb removal, earthwork, installation of 3,000 LF of curb, and 2,500 SY asphalt paving. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: SCHOOL GROUNDS CONSTRUCTION MORE PROJECTS

Read More

Avenida Escuela Widening

Awarded by the City of Sierra Vista, this project included widening Avenida Escuela from two lanes to four lanes between Camino del Norte and SR-90. Construction included earthwork, installing culvert extensions, scuppers, 3,200 LF of curb and gutter, concrete driveways, 500 LF retaining wall, a bike path and paving 8,000 SY of asphalt. PROJECT OVERVIEW LOCATION: SIERRA…

Read More