Delivery Method: Bid-Build

Location: Stone Avenue from Speedway Boulevard to Drachman Street

Owner: City of Tucson Department of Transportation

Description: Roadway reconstruction consists of new median islands, landscaping, a drainage structure, curb, sidewalk, curb access ramps, driveways, and street lighting. New traffic signals will be installed at the Drachman and Speedway intersections and three new bus pullouts will be constructed. In addition, a new water distribution system will be constructed and the old system removed.