Projects

Avenida Escuela Widening

Awarded by the City of Sierra Vista, this project included widening Avenida Escuela from two lanes to four lanes between Camino del Norte and SR-90. Construction included earthwork, installing culvert extensions, scuppers, 3,200 LF of curb and gutter, concrete driveways, 500 LF retaining wall, a bike path and paving 8,000 SY of asphalt.

Myer School Track

This project consisted of the removal and replacement of a running track. Construction included milling, curb removal, earthwork, installation of 3,000 LF of curb, and 2,500 SY asphalt paving.

Hydrant Replacement Project

This contract involved the replacement of 29 hydrants throughout the City of Tombstone. We faced several challenges with this project, including working with various types of pipe and removing hydrants dated as far back as 1942.  

City of Williams Water Meter Replacement

The Williams Water Meter Replacement project is in the final stage of meter installations. To date there has been nearly 1500 meters installed, which is more than what we expected to install. Our meter crews have discovered several meters during the installation process that the city did not know existed. Some of these meters have... Read more »

South East Interceptor (SEI) Augmentation CMAR Project

Delivery Method: Construction Manager at Risk Location: Euclid Avenue between 18th Street and 36 Street Owner: Pima County Regional Wastewater Reclamation Department Description: Augmentation of existing Southeast Interceptor (SEI) by installation of 4 miles of 36-48 inch sewer through the jurisdiction of Tucson and South Tucson. Includes bypass pumping and relocation of several waterlines. For construction... Read more »

22nd Street Sewer Augmentation

Delivery Method: Construction Manager at Risk Location: 22nd Street from Alvernon Way to Swan Road Owner: Pima County Regional Wastewater Reclamation Department Description: This project consists of the augmentation of approximately 1 mile of wastewater lines. The selected stretch to be augmented is along 22nd Street from Alvernon Way, downstream end, to Swan Rd, upstream... Read more »

Kostka & Michigan Sewer Realignments

The Kostka & Michigan Sewer Realignments Project was awarded to KE&G by PCRWRD in February 2015. The project consists of replacing an 8-in waterline; installing, removing and replacing, and abandoning 13 manholes; installing 562 feet of new sewer main; abandoning 612 feet of existing sewer main and abandoning four existing house sewer connections and replacing with new materials across three... Read more »

ADOT SR-90 (SR-92 to Giulio Cesare Avenue)

Awarded in September 2014 by the City of Sierra Vista, this project runs along SR-90 and begins near the SR 92 intersection, extending east to Guilio Cesare Road. KE&G Construction will be installing roadway lighting, a HAWK crossing signal, and a shared use pathway located on the south side of the roadway. This project was designed to provide... Read more »