KE&G was approached by the Boys and Girls Club located in Bisbee, Arizona to construct a new fenced-in soccer field and outdoor concrete basketball court. Once the cost budget and design was created it was presented to the Legacy Foundation for a grant which was later approved. 

The project consisted of removing approximately 1,400 square yards of existing parking lot, bringing in borrow to create a level area for the new soccer field, constructing a 30-inch retaining wall, installing new irrigation, new light pole, a handicap access ramp, a handicap drinking fountain, a new concrete basketball court, and a 6-foot-tall fence around the perimeter.