Projects

Aerospace Parkway Sewer Extension

Many people have probably heard about Pima County Investing about $20,000,000.00 to build a facility for World View, a company which launches “Space Bubbles” over 19 miles high into Earth’s Stratosphere. As part of the job, new sewer, water, and dry utilities needed to be installed a little over three quarters of a mile along... Read more »

Palominas Recharge and Flood Control Project

The goal of this award winning project was to build a storm water drainage system which will slow down and re-direct rainwater from the summer monsoons back to the San Pedro River and back into the ground to the aquifers. The basin and channels are designed to encourage the rainwater to infiltrate the ground and enter... Read more »

Boys and Girls Club

KE&G was approached by the Boys and Girls Club located in Bisbee, Arizona to construct a new fenced-in soccer field and outdoor concrete basketball court. Once the cost budget and design was created it was presented to the Legacy Foundation for a grant which was later approved.  The project consisted of removing approximately 1,400 square yards... Read more »

Davis Road: SR-80 to US-191

Delivery Method: Bid-Build Location: Davis Road in Tombstone, Arizona Owner: Arizona Department of Transporation Description: Davis Road is an Arizona Department of Transporation Project that is located in Cochise County just east of Tombstone, Arizona. The main portion of this project begins at mile post 9.9 on Davis Road. KE&G was awarded this project on December... Read more »

Benson-Stein Pass Highway (Texas Canyon Rest Area)

This project is located in Cochise County along Interstate 10 at milepost 320, approximately 15 miles east of the City of Benson. The work included upgrading equipment in the restrooms, pump house, ramadas, and well site, in addition to sewer system rehabilitation. Construction included installing six new evaporation pond liners, waterline distribution replacement, micro surfacing... Read more »

Stone Avenue – Speedway Blvd to Drachman St

Delivery Method: Bid-Build Location: Stone Avenue from Speedway Boulevard to Drachman Street Owner: City of Tucson Department of Transportation Description: Roadway reconstruction consisting of new median islands, landscaping, a drainage structure, curb, sidewalk, curb access ramps, driveways, and street lighting. New traffic signals will be installed at the Drachman and Speedway intersections and three new bus pullouts... Read more »

ADOT SR-80 Tombstone

  Arizona Department of Transportation has begun a long awaited project to improve pedestrian safety and the appearance of State Route 80 where it passes through historic Tombstone. The overall project includes road improvements, and repairing damaged sections of historic buildings along Freemont Street. Freemont Street is located in the town’s historic district that comes... Read more »

Pantano Riverpath 5th Street to Speedway Boulevard

This project runs parallel to the Pantano Wash between the 5th St Wash and Speedway Blvd in Tucson, Arizona.  The project consists of a 95 foot span prefabricated steel pedestrian bridge as well as 1,250 feet of asphalt path, decomposed granite paths, a ramada shade shelter, various landscape features, and project artwork.

Harrison Greenway Multi-Use Pathway

This project consists of improvements for a new 3.2 mile long, 12 foot wide asphalt multi-use pathway. The Pathway starting on the South side of Irvington at an existing crosswalk will continue South across Valencia linking up with Mesquite Elementary School. It is a fast paced project, with limited public impact, and promises to bring... Read more »